Toilet renovation: where to start

The bathroom is an area with special requirements: high humidity, humidity differences. That’s why making fixes in the bathroom, you should definitely plan the whole operating process, to think about the sequence of measures to be achieved. In the following guide, you will find out the way to begin the fix in the bathroom and what kinds of work ought to be performed with your hands. Step-by-step directions for bathroom repair

Stage 1: drawing up a plan and deciding on a design solution.

Fix in the bathroom can be of two types:

  • Unplanned, spontaneous, originating from the can of unexpected conditions. By way of example, in case of a pipe burst, flooding with neighbors.
  • Planned, that is either capital or cosmetic. It requires planning, serious fiscal investment and time.

Begin repairs at the toilet is to find out the plan, inside. Think through to the last detail, what’s going to be the room, choose a colour. Pastel colors are conventional, as well as a mix of blue and blue, or cherry with beige.

Begin repairs at the toilet is to ascertain the plan, interior design. Consider detail, what’s going to be the room, pick a color. Pastel colours are considered traditional, in addition to a mix of colors.

Next point is the selection of facing substance. Generally, finishing at the bathroom is performed with vinyl, porcelain tiles, mosaic, vinyl panels. Examine the pipes, if it ought to be mended. If necessary, choose the right choice. Proceed to the measuring function: quantify all sides, calculate the area of the room. Based on these data, we mark the location of the plumbing fittings.

Measure 2: the choice of sanitary fittings and material for completing.

It’s necessary to understand that the purchase of sanitary ware simplifies the preparation stage, and not vice versa. This usually means that first we create a design project, make a plan, and then go to the shop. The following thing – you should specify how big your favourite plumbing fixtures and check the plan, whether it fits.

It’s necessary to see that the cost of plumbing fixtures is preceded by a preparation stage, and not vice versa. This means that first we develop a design project, make a plan, and then go to the shop. Another one

As for materials for completing, it is better to buy them instantly for the whole repair cycle, so that then you will not be distracted if something was missing. Do not forget about preparing the necessary tools.

Measure 3: dismantling tiling and plumbing.

Once all the preliminary work is done, proceed to the Start of the task process:

  • Remove the sink and bathtub from the room, even though they won’t be replaced with fresh ones. In this way, you may keep them clean and undamaged.
  • Eliminate the old tile, cleaning after it all surfaces: ceiling, walls, floor.
  • Remove paint from the walls, even if they were formerly painted, as the adhesive solution or a fresh layer of paint won’t adhere to surface.

Step 4: Cost of communications: pipes, electrical wiring.

Quite frequently in an older house, you ought to carefully inspect and replace not just the pipes that are in the toilet itself, but also the major riser, and on occasion the interfloor pipes. Why is it worth doing so? Old pipes at any time can give a flow, then the new repair will be emptied, it will require vsyakuhnya.ru additional investment to get rid of defects.